This outlines a new patch branching strategy to avoid the conflicts we've been running into recently. This will introduce more friction in the form of two PRs for released bug fixes during patch weeks. The benefit is that we won't have to deal with merge conflicts when we're cherry-picking commits into the patch branch, which sometimes becomes a big distraction for the team. We also found ourselves in a situation with 4.46.3 where we couldn't release a fix without rewriting it because it had been built on top of feature code that was not included in the patch. That was the motivation to make this change. --------- Co-authored-by: George Karr <georgekarrv@users.noreply.github.com> Co-authored-by: Sam Pfluger <108141731+Sampfluger88@users.noreply.github.com> |
||
---|---|---|
.. | ||
Debugging.md | ||
engineering.rituals.yml | ||
Load-testing.md | ||
README.md | ||
scaling-fleet.md |
Engineering
This handbook page details processes specific to working with and within this department
Team
Role | Contributor(s) |
---|---|
CTO | Luke Heath (@lukeheath) |
Engineering Manager | See "Current product groups" |
Quality Assurance | Reed Haynes (@xpkoala) |
Developer | See "Current product groups" |
Contact us
- To make a request of this department, create an issue and a team member will get back to you within one business day (If urgent, mention a team member in the #help-engineering Slack channel.
- Any Fleet team member can view the kanban boards for this department, including pending tasks and the status of new requests.
- Please use issue comments and GitHub mentions to communicate follow-ups or answer questions related to your request.
Responsibilities
The 🚀 Engineering department at Fleet is directly responsible for writing and maintaining the code for Fleet's core product and infrastructure.
Record engineering KPIs
We track the success of this process by observing the throughput of issues through the system and identifying where buildups (and therefore bottlenecks) are occurring. The metrics are:
- Number of bugs opened this week
- Total # bugs open
- Bugs in each state (inbox, acknowledged, reproduced)
- Number of bugs closed this week
Each week these are tracked and shared in the weekly KPI sheet by Luke Heath.
Create an engineering-initiated story
Engineering-initiated stories are types of user stories created by engineers to make technical changes to Fleet. Technical changes should improve the user experience or contributor experience. For example, optimizing SQL that improves the response time of an API endpoint improves user experience by reducing latency. A script that generates common boilerplate, or automated tests to cover important business logic, improves the quality of life for contributors, making them happier and more productive, resulting in faster delivery of features to our customers.
It is important to frame engineering-initiated user stories the same way we frame all user stories. Stay focused on how this technical change will drive value for our users.
To create an engineering-initiated user story, follow the user story drafting process. Once your user story is created using the new story template, make sure the ~engineering-initiated
label is added and the engineering output and architecture DRI (@lukeheath) is assigned.
What happens next? The engineering output and architecture DRI reviews engineering-initiated stories weekly.
If there are product changes (i.e. interface, documentation, or dependency changes), the story is added to the "New requests" column on the drafting board.
If there are no product changes, and the DRI decides to prioritize the story, the story is added to the "Specified" column on drafting board so that it can be estimated.
We prefer the term engineering-initiated stories over technical debt because the user story format helps keep us focused on our users and contributors.
Manage release branches
Every three weeks, release a minor version of Fleet from the main
branch.
Every week between minor releases, release a patch release with fixes for released bugs.
The DRI for publishing a release is responsible for creating the next patch branch. Create a patch branch off the latest tagged release of Fleet. Submit PRs for released bug fixes directly to the target patch branch to avoid merge conflicts later in the release cycle. After merging into the patch branch, submit another PR to main
containing the same fix and resolve any merge conflicts.
It is the responsibility of the person merging the fix into the patch branch to make sure the fix is also merged into
main
.
Fix a bug
If the bug is labeled ~unreleased bug
, branch off and put your PR into main
.
If the bug is labeled ~released bug
, branch off and put your PR into the upcoming patch branch patch-fleet-v4.x.x
. If you are unsure which branch to use, confirm with your manager. Don't forget to also submit a second PR to main
after the bug is confirmed fixed.
Begin a merge freeze
To ensure release quality, Fleet has a freeze period for testing beginning the Tuesday before the release at 9:00 AM Pacific. Effective at the start of the freeze period, new feature work will not be merged into main
.
Bugs are exempt from the release freeze period.
To begin the freeze, open the repo on Merge Freeze and click the "Freeze now" button. This will freeze the main
branch and require any PRs to be manually unfrozen before merging. PRs can be manually unfrozen in Merge Freeze using the PR number.
Any Fleetie can unfreeze PRs on Merge Freeze if the PR contains documentation changes or bug fixes only. If the PR contains other changes, please confirm with your manager before unfreezing.
Merge a pull request during the freeze period
We merge bug fixes, documentation changes, and website updates during the freeze period, but we do not merge other code changes. This minimizes code churn and helps ensure a stable release. To merge a bug fix, you must first unfreeze the PR in Merge Freeze, and click the "Unfreeze 1 pull request" text link.
To allow a stable release test, the final 24 hours before release is a deep freeze when only bugs with the
~release-blocker
or~unreleased-bug
labels are merged.
If there is partially merged feature work when freeze begins, the previously merged code must be reverted. If there is an exceptional, business-critical need to merge feature work during freeze, as determined by the release ritual DRI, the following exception process may be followed:
- The engineer requesting the feature work merge exception during freeze notifies their Engineering Manager.
- The Engineering Manager notifies the QA lead for the product group and the release ritual DRI.
- The Engineering Manager, QA lead, and release ritual DRI must all approve the feature work PR before it is unfrozen and merged.
This exception process should be avoided whenever possible. Any feature work merged during freeze will likely result in a significant release delay.
Confirm latest versions of dependencies
Before kicking off release QA, confirm that we are using the latest versions of dependencies we want to keep up-to-date with each release. Currently, those dependencies are:
- Go: Latest minor release
- Check the version included in Fleet.
- Check the latest minor version of Go. For example, if we are using
go1.19.8
, and there is a new minor versiongo1.19.9
, we will upgrade. - If the latest minor version is greater than the version included in Fleet, file a bug and assign it to the release ritual DRI and the current oncall engineer. Add the
~release blocker
label. We must upgrade to the latest minor version before publishing the next release. - If the latest major version is greater than the version included in Fleet, create a story and assign it to the release ritual DRI and the current oncall engineer. This will be considered for an upcoming sprint. The release can proceed without upgrading the major version.
- Note that major version upgrades also require an update to go.mod.
In Go versioning, the number after the first dot is the "major" version, while the number after the second dot is the "minor" version. For example, in Go 1.19.9, "19" is the major version and "9" is the minor version. Major version upgrades are assessed separately by engineering.
- macadmins-extension: Latest release
- Check the latest version of the macadmins-extension.
- Check the version included in Fleet.
- If the latest stable version of the macadmins-extension is greater than the version included in Fleet, file a bug and assign it to the release ritual DRI and the current on-call engineer.
- Add the
~release blocker
label.
Note: Some new versions of the macadmins-extension include updates that require code changes in Fleet. Make sure to note in the bug that the update should be checked for any changes, like new tables, that require code changes in Fleet.
Our goal is to keep these dependencies up-to-date with each release of Fleet. If a release is going out with an old dependency version, it should be treated as a critical bug to make sure it is updated before the release is published.
- osquery: Latest release
- Check the latest version of osquery.
- Check the version included in Fleet.
- If the latest release of osquery is greater than the version included in Fleet, file a bug and assign it to the release ritual DRI and the current on-call engineer.
- Do not add the
~release blocker
label. - Update the bug description to note that changes to osquery command-line flags require updates to Fleet's flag validation and related documentation as shown in this pull request.
- Vulnerability data sources
- Check the NIST National Vulnerability Database website for any announcements that might impact our NVD data feed.
- Check the CISA website for any news or announcements that might impact our CISA data feed.
If an announcement is found for either data source that may impact data feed availability, notify the current on-call engineer. Notify them that it is their responsibility to investigate and file a bug or take further action as necessary.
- Fleetd components
- Check for code changes to Orbit or Desktop since the last
orbit-*
tag was published. - Check for code changes to the fleetd-chrome extension since the last
fleetd-chrome-*
tag was published.
If code changes are found for any fleetd
components, create a new release QA issue to update fleetd
. Delete the top section for Fleet core, and retain the bottom section for fleetd
. Populate the necessary version changes for each fleetd
component.
Create release QA issue
Next, create a new GitHub issue using the Release QA template. Add the release version to the title, and assign the quality assurance members of the MDM and Endpoint ops product groups.
The issue's template will contain validation steps for Fleet and individual fleetd
components. Remove any instructions that do not apply to this release.
Indicate your product group is release-ready
Once a product group completes its QA process during the freeze period, its QA lead moves the smoke testing ticket to the "Ready for release" column on their ZenHub board. They then notify the release ritual DRI by tagging them in a comment, indicating that their group is prepared for release. The release ritual DRI starts the release process after all QA leads have made these updates and confirmed their readiness for release.
Prepare Fleet release
Documentation on completing the release process can be found here.
Deploy a new release to dogfood
After each Fleet release, the new release is deployed to Fleet's "dogfood" (internal) instance.
How to deploy a new release to dogfood:
- Head to the Tags page on the fleetdm/fleet Docker Hub: https://hub.docker.com/r/fleetdm/fleet/tags
- In the Filter tags search bar, type in the latest release (ex. v4.19.0).
- Locate the tag for the new release and copy the image name. An example image name is "fleetdm/fleet:v4.19.0".
- Head to the "Deploy Dogfood Environment" action on GitHub: https://github.com/fleetdm/fleet/actions/workflows/dogfood-deploy.yml
- Select Run workflow and paste the image name in the The image tag wished to be deployed. field.
Note that this action will not handle down migrations. Always deploy a newer version than is currently deployed.
Note that "fleetdm/fleet:main" is not a image name, instead use the commit hash in place of "main".
Conclude current milestone
Immediately after publishing a new release, we close out the associated GitHub issues and milestones.
-
Rename current milestone: In GitHub, change the current milestone name from
4.x.x-tentative
to4.x.x
.4.37.0-tentative
becomes4.37.0
. -
Update product group boards: In ZenHub, go to each product group board tracking the current release. Usually, these are #g-endpoint-ops and #g-mdm.
-
Remove milestone from unfinished items: If you see any items in columns other than "Ready for release" tagged with the current milestone, remove that milestone tag. These items didn't make it into the release.
-
Prep release items: Make sure all items in the "Ready for release" column have the current milestone and sprint tags. If not, select all items in the column and apply the appropriate tags.
-
Move user stories to drafting board: Select all items in "Ready for release" that have the
story
label. Apply the:product
label and remove the:release
label. These items will move back to the product drafting board. -
Confirm and close: Make sure that all items with the
story
label have left the "Ready for release" column. Select all remaining items in the "Ready for release" column and move them to the "Closed" column. This will close the related GitHub issues. -
Confirm and celebrate: Now, head to the Drafting board. Find all
story
issues with the current milestone (these are the ones you just moved). Move them to the "Confirm and celebrate" column. Product will close the issues during their confirm and celebrate ritual. -
Close GitHub milestone: Visit GitHub's milestone page and close the current milestone.
-
Create next milestone: Create a new milestone for the next versioned release,
4.x.x-tentative
. -
Remove the freeze: Open the repo in Merge Freeze and click the "Unfreeze" button.
-
Announce that
main
is unfrozen and the milestone has been closed in #help-engineering. -
Create a branch for the next patch and push it to GitHub. For example, if you release
fleet-v4.44.0
, create a branch calledpatch-fleet-v4.44.1
.
Update the Fleet releases calendar
The Fleet releases Google calendar is kept up-to-date by the release ritual DRI. Any change to targeted release dates is reflected on this calendar.
Review a community pull request
If you're assigned a community pull request for review, it is important to keep things moving for the contributor. The goal is to not go more than one business day without following up with the contributor.
A PR should be merged if:
- It's a change that is needed and useful.
- The CI is passing.
- Tests are in place.
- Documentation is updated.
- Changes file is created.
For PRs that aren't ready to merge:
- Thank the contributor for their hard work and explain why we can't merge the changes yet.
- Encourage the contributor to reach out in the #fleet channel of osquery Slack to get help from the rest of the community.
- Offer code review and coaching to help get the PR ready to go (see note below).
- Keep an eye out for any updates or responses.
Sometimes (typically for Fleet customers), a Fleet team member may add tests and make any necessary changes to merge the PR.
If everything is good to go, approve the review.
For PRs that will not be merged:
- Thank the contributor for their effort and explain why the changes won't be merged.
- Close the PR.
Merge a community pull request
When merging a pull request from a community contributor:
- Ensure that the checklist for the submitter is complete.
- Verify that all necessary reviews have been approved.
- Merge the PR.
- Thank and congratulate the contributor.
- Share the merged PR with the team in the #help-promote channel of Fleet Slack to be publicized on social media. Those who contribute to Fleet and are recognized for their contributions often become great champions for the project.
Schedule developer on-call workload
Engineering managers are asked to be aware of the on-call rotation and schedule a light workload for engineers while they are on-call. While it varies week to week considerably, the on-call responsibilities can sometimes take up a substantial portion of the engineer's time.
We aspire to clear sprint work for the on-call engineer, but due to capacity or other constraints, sometimes the on-call engineer is required for sprint work. When this is the case, the EM will work with the on-call engineer to take over support requests or @oncall assignment completely when necessary.
The remaining time after fulfilling the responsibilities of on-call is free for the engineer to choose their own path. Please choose something relevant to your work or Fleet's goals to focus on. If unsure, speak with your manager.
Some ideas:
- Do training/learning relevant to your work.
- Improve the Fleet developer experience.
- Hack on a product idea. Note: Experiments are encouraged, but not all experiments will ship! Check in with the product team before shipping user-visible changes.
- Create a blog post (or other content) for fleetdm.com.
- Try out an experimental refactor.
Edit a DNS record
We use Cloudflare to manage the DNS records of fleetdm.com and our other domains. To make DNS changes in Cloudflare:
- Log into your Cloudflare account and select the "Fleet" account.
- Select the domain you want to change and go to the DNS panel on that domain's dashboard.
- To add a record, click the "Add record" button, select the record's type, fill in the required values, and click "Save". If you're making changes to an existing record, you only need to click on the record, update the record's values, and save your changes.
If you need access to Fleet's Cloudflare account, please ask the DRI Luke Heath in Slack for an invitation.
Assume developer on-call alias
The on-call developer is responsible for:
- Knowing the on-call rotation.
- Preforming the on-call responsibilities.
- Escalating community questions and issues.
- Successfully transferring the on-call persona to the next developer.
Notify stakeholders when a user story is pushed to the next release
User stories are intended to be completed in a single sprint. When a user story selected for a release has not merged into main
by the time the merge freeze begins, it is the product group EM's responsibility to notify stakeholders:
- Add the
~pushed
label to the user story. - Update the user story's milestone to the next minor version milestone.
- Comment on the GitHub issue and at-mention the PM and anyone listed in the requester field.
- If
customer-
labels are applied to the user story, at-mention the VP of Customer Success.
Run Fleet locally for QA purposes
To try Fleet locally for QA purposes, run fleetctl preview
, which defaults to running the latest stable release.
To target a different version of Fleet, use the --tag
flag to target any tag in Docker Hub, including any git commit hash or branch name. For example, to QA the latest code on the main
branch of fleetdm/fleet, you can run: fleetctl preview --tag=main
.
To start a preview without starting the simulated hosts, use the --no-hosts
flag (e.g., fleetctl preview --no-hosts
).
For each bug found, please use the bug report template to create a new bug report issue.
For unreleased bugs in an active sprint, a new bug is created with the ~unreleased bug
label. The :release
label and associated product group label is added, and the engineer responsible for the feature is assigned. If QA is unsure who the bug should be assigned to, it is assigned to the EM. Fixing the bug becomes part of the story.
Accept new Apple developer account terms
Engineering is responsible for managing third-party accounts required to support engineering infrastructure. We use the official Fleet Apple developer account to notarize installers we generate for Apple devices. Whenever Apple releases new terms of service, we are unable to notarize new packages until the new terms are accepted.
When this occurs, we will begin receiving the following error message when attempting to notarize packages: "You must first sign the relevant contracts online." To resolve this error, follow the steps below.
-
Visit the Apple developer account login page.
-
Log in using the credentials stored in 1Password under "Apple developer account".
-
Contact the Head of Business Operations to determine which phone number to use for 2FA.
-
Complete the 2FA process to log in.
-
Accept the new terms of service.
Interview a developer candidate
As a hiring manager we want to ensure the interview process follows these steps in order. This process must follow creating a new position through receiving job applications. Once the position is approved manage this process per candidate in hiring pipeline
- Reach out: If you are not already the primary contact with this candidate send an email or linkedin message introducing yourself and the intent that you would like the start the interview process including the link to the position and asking if they are comfortable with completing a coding exercise.
- Deliver code prompt: After recieving confirmation that they are interested download the zip of the code challenge and ask them to complete this and send their entry back within 5 business days.
- Test code prompt: Verify the code runs and can complete the challenge correctly. Check the code for good style and tests that match our standards here at Fleet.
- Schedule manager interview: Send the candidate a calendly link for 1hr to talk to you and screen them if they are a good fit for this role and our culture.
- Schedule technical interview: Send the candidate a calendly link for 1hr to talk to a senior engineer on your team where the goal is to understand the thechnical capabilities of the candidate. An additional engineer can optionally join if available.
- Schedule DOPD interview: Send the candidate a calendly link for 30m talk to the Director of Product Development @lukeheath.
- Schedule CTO interview: Send the candidate a calendly link for 30m talk with our CTO @lukeheath.
If the candidate passes all of these steps then continue with hiring a new team member.
Renew MDM certificate signing request (CSR)
The certificate signing request (CSR) certificate expires every year. It needs to be renewed prior to expiring. This is notified to the team by the MDM calendar event IMPORTANT: Renew MDM CSR certificate
Steps to renew the certificate:
- Visit the Apple developer account login page.
- Log in using the credentials stored in 1Password under Apple developer account.
- Verify you are using the Enterprise subaccount for Fleet Device Management Inc.
- Generate a new certificate following the instructions in MicroMDM.
- Note:
mdmctl
(a micromdm command for MDM vendors) will generate aVendorPrivateKey.key
andVendorCertificateRequest.csr
using an appropriate shared email relay and a passphrase (suggested generation method with pwgen available in brew / apt / yumpwgen -s 32 -1vcy
) - Uploading
VendorCertificateRequest.csr
to Apple you will download a correspondingmdm.cer
file - Convert the downloaded cert to PEM with
openssl x509 -inform DER -outform PEM -in mdm.cer -out server.crt.pem
- Update the Config vars in Heroku:
- Update
sails_custom__mdmVendorCertPem
with the results from step 7server.crt.pem
- Update
sails_custom__mdmVendorKeyPassphrase
with the passphrase used in step 4 - Update
sails_custom__mdmVendorKeyPem
withVendorPrivateKey.key
from step 4
- Store updated values in Confidential 1Password Vault
- Verify by logging into a normal apple account (not billing@...) and Generate a new Push Certificate following our setup MDM steps and verify the Expiration date is 1 year from today.
- Adjust calendar event to be between 2-4 weeks before the next expiration.
Perform an incident postmortem
At Fleet, we take customer incidents very seriously. After working with customers to resolve issues, we will conduct an internal postmortem to determine any process, documentation, or coding changes to prevent similar incidents from happening in the future. Why? We strive to make Fleet the best osquery management platform globally, and we sincerely believe that starts with sharing lessons learned with the community to become stronger together.
At Fleet, we do postmortem meetings for every service or feature outage and every critical bug, whether it's a customer's environment or on fleetdm.com.
-
Postmortem documentation Before running the postmortem meeting, copy this postmortem template document and populate it with some initial data to enable a productive conversation.
-
Postmortem meeting Invite all stakeholders, typically the team involved and QA representatives.
Follow the document topic by topic. Keep the goal in mind which is to take action items for addressing the root cause and making sure a similar incident will not happen again.
Distinguish between the root cause of the bug, which by that time was solved and released, and the root cause of why this issue reached our customers. These could be different issues. (e.g. the root cause of the bug was a coding issue, but the root causes (plural) of the event may be that the test plan did not cover a specific scenario, a lack of testing, and a lack of metrics to identify the issue quickly).
- Postmortem action items Each action item will have an owner that will be responsible for creating a Github issue promptly after the meeting. This Github issue should be prioritized with the relevant PM/EM.
Rituals
Stubs
The following stubs are included only to make links backward compatible.
Weekly bug review
handbook/company/product-groups#weekly-bug-review
Please see docs/contributing/infrastructure for below
Infrastructure
Infrastructure links
Best practices for containers
Please see docs/contributing/infrastructure for above
Measurement
Please see handbook/engineering#record-engineering-kpis
Critical bug notification process
Please see handbook/engineering#notify-community-members-about-a-critical-bug
Finding bugs
Please see handbook/engineering#run-fleet-locally-for-qa-purposes
Scrum at Fleet
Please see handbook/company/product-groups#scrum-at-fleet
Scrum items
Please see handbook/company/product-groups#scrum-items)
Sprint ceremonies
Please see handbook/company/product-groups#sprint-ceremonies
Meetings
Please see handbook/company/product-groups#meetings
Principles
Please see handbook/company/product-groups#principles
Please see handbook/company/product-groups#eng-together for below
Eng Together
Participants
Agenda
Please see handbook/company/product-groups#eng-together for above
Please see handbook/company/product-groups#group-weeklies for below
User story discovery
Participants
Agenda
Please see handbook/company/product-groups#group-weeklies for above
Please see handbook/company/product-groups#group-weeklies for below
Group weeklies
Participants
Sample agenda (Frontend weekly)
Please see handbook/company/product-groups#group-weeklies for above
Engineering-initiated stories
Creating an engineering-initiated story
Please see handbook/engineering#create-an-engineering-initiated-story for above
Please see handbook/engineering#accept-new-apple-developer-account-terms for below
Accounts
Apple developer account
Please see handbook/engineering#accept-new-apple-developer-account-terms for above
Merging during the freeze period
Please see handbook/engineering#merge-a-pull-request-during-the-freeze-period
Scrum boards
Please see handbook//product-groups#current-product-groups
Please see handbook/engineering#begin-a-merge-freeze for below
Release freeze period
Freeze day
Please see handbook/engineering#begin-a-merge-freeze for above
Release day
Please see handbook/engineering#prepare-fleet-release
Deploying to dogfood
Please see handbook/engineering#deploy-a-new-release-to-dogfood
Please see handbook/engineering#conclude-current-milestone for below
Milestone release ritual
Update milestone in GitHub
ZenHub housekeeping
Please see handbook/engineering#conclude-current-milestone for above
Clearing the plate
Please see handbook/engineering#schedule-developer-on-call-workload
Check dependencies
Please see handbook/engineering#confirm-latest-versions-of-dependencies
Release readiness
Please see handbook/engineering#indicate-your-product-group-is-release-ready
Improve documentation
Please see handbook/company/product-groups#documentation-for-contributors
How to reach the on-call engineer
Please see handbook/company/product-groups#how-to-reach-the-developer-on-call
The rotation
Please see handbook/company/product-groups#the-developer-on-call-rotation
Please see handbook/company/product-groups#the-developer-on-call-rotation for below
Second-line response
PR reviews
Customer success meetings
Please see handbook/company/product-groups#the-developer-on-call-rotation for above
Escalations
Please see handbook/company/product-groups#escalations
Handoff
Please see handbook/company/product-groups#changing-of-the-guard
Please see handbook/company/product-groups#quality for below
Quality
Human-oriented QA
Bug process
Debugging
Bug states
Please see handbook/company/product-groups#quality for above
Inbox
Please see handbook/company/product-groups#inbox
Please see handbook/company/product-groups#reproduced for below
Reproduced
Fast track for Fleeties
Please see handbook/company/product-groups#reproduced for above
In product drafting (as needed)
Please see handbook/company/product-groups#in-product-drafting-as-needed
In engineering
Please see handbook/company/product-groups#in-engineering
Awaiting QA
Please see handbook/company/product-groups#awaiting-qa
Please see handbook/company/product-groups#all-bugs for below
All bugs
Bugs closed this week
Bugs closed this week
Please see handbook/company/product-groups#all-bugs for above
Please see handbook/company/product-groups#release-testing for below
Release testing
Release blockers
Critical bugs
Please see handbook/company/product-groups#release-testing for above
Reviewing PRs from the community
Please see handbook/engineering#review-a-community-pull-request
Merging community PRs
Please see handbook/engineering#merge-a-community-pull-request
Changes to tables' schema
Please see handbook/company/product-groups#changes-to-tables-schema
Please see handbook/engineering#preform-an-incident-postmortem for below
Incident postmortems
Postmortem document
Postmortem meeting
Postmortem action items
Please see handbook/engineering#preform-an-incident-postmortem for below
Outages
handbook/company/product-groups#outages
Scaling Fleet
handbook/company/product-groups#scaling-fleet
Load testing
handbook/company/product-groups#load-testing